Installation Guidance
Required Tools For proper Installtaion
Power Tools (Optional)
•
Table Saw, Electric
Miter Saw, Band Saw, Chop Saw, Power Jamb Saw, or Jig Saw
Hand Tools (Optional)
•
Broom and dust pan or Vacuum
•
Tape Measure
•
Moisture meter (wood, concrete or both)
•
Chalk line & chalk
•
3M Blue Tape
•
Hand saw
•
Hammer
•
Rubber mallet
•
Tapping block
•
Pry bar
•
Filler stick and Touch-up marker
•
Hardwood Floor Cleaner
Additional
Tools for Glue-Down
(Optional)
•
Recommended
Adhesive & Adhesive
Remover
•
Trowel (Follow adhesive
manufacturer’s instruction)
Additional
Tools for Staple-Down Installation (Optional)
•
Pneumatic Stapler/Nailer (Goodfellow recommends the HIGH PRO stapler
Model AS-4090)
•
Staples/Flooring Cleats
•
Drill
Additional
Tools for Floating
Installation (Optional)
•
6 mil Polyethylene Vapor Barrier
•
Foam
Underlayment
• Floating Floor Glue (Goodfellow recommends the Goodfellow adhesive with a silicone base in a 474 ml bottle)
STEP BY STEP INSTALLATION INSTRUCTION
(Glued down application)
STEP *1 – Establish a starting line
- For best visual effect, it is recommended that flooring be installed parallel to the longest wall in the room.
- Using a chalk line the area between the wall and the chalk line becomes your working area for starting installation, and your last installation area for completing the installation.
STEP *2 – Spread the adhesive
- Apply the recommended adhesive with a trowel according to the manufacturer installation instructions (found on the adhesive pail) for the specific adhesive that is being used.
STEP *3 – Install the strips
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible. Pieces with flaws should be recut.
- Using the working area to install your flooring, line up the first strip with the tongue facing the wall, then press the strip into the adhesive and against the holding block.
- Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- Continue with the subsequent rows in the same manner.
- To avoid shifting or gaping of the strips during installation, use 3M blue tape to hold them together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may damage the finish.
- When you get to the final row you will likely find it necessary to rip-saw the strips to fit against the wall. Install using the pry bar and leave 1/4 -inch (6 mm) minimum expansion spaces.
STEP *4 – Install the transition pieces
• Install any transition piece
that may be needed, such as
stair nosing, and reducers. These
products are available prefinished to blend with your flooring. Please
install these first so that you can match the next board easier, color match on
mouldings cannot be guaranteed due to the natural characteristics of wood
flooring.
• Reinstall
your baseboards and/or
quarter round mouldings. Be certain to nail the mouldings into the
wall, not the floor.
• Always keep a few spare strips from your initial installation for possible repairs in a sealed carton and properly stored
• Wait 24 hours before moving furniture and appliances back into the area where flooring was installed.
STEP-BY-STEP
INSTALLATION INSTRUCTION
(Nailed/stapled down application)
Set-up and Use of Pneumatic Staplers and Nailers
-Read and follow the manufacturer’s instructions for complete set-up and operation of equipment.
- Make sure the adapter size for the pneumatic stapler or nailer matches the thickness of the flooring being installed and that the tool’s adapter seats properly in the tongue of the flooring.
- Pneumatic nailer: Air pressure should be adjusted adequately for each species of hardwood floor installed and checked regularly (always try it before using).
STEP *1 – Establish a starting line
• Using a chalk line, draw a guideline.
• It is very important to start straight and square.
STEP *2 – Install the
floor
- Always select your strips with care. The more deeply colored strips should be installed where they are less visible (i.e. in a closet or under the refrigerator). Pieces with flaws should be recut.
- Use the longest, straightest strips available for the first row.
- Install the first row of flooring with groove facing starter wall.
- The first few rows must be nailed down by hand rather than with the nailing machine because of the vertical wall obstruction. Nailing interval should be at 6 inches. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
- Start the second row with a strip of a least 6-inch (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
- When the area is free from wall obstruction, you can repeat the installation using a pneumatic stapler.
- It is also likely that you may have to ripsaw the strips to fit the final row against the wall. Leave 1/4 - inch (6 mm) minimum expansion spaces.
- Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
STEP-BY-STEP INSTALLATION INSTRUCTION
(Floating
application)
STEP *1 – Install underlayments
- Install 6 mil Polyethylene vapor barrier over entire flooring surface. Overlap sheets of Polyethylene 16 inches and tape together creating airtight seal. Run the vapor barrier 1 to 1.5 inches up the walls and secure in place with tape.
- Using underlayment, roll out one roll at a time over the vapor barrier. There are many types of underlayments available today. The use of acoustical underlayment will improve the feel and sound transmission of your flooring.
STEP *2 – Preparing the starter rows
-It is very important that enough expansion gaps are kept between the flooring and all the walls. This is done by placing ¼ inch (6 mm) spacers every 8 inches apart around all vertical walls.
-Measure the width of the room – perpendicular to the direction you intend to install the flooring. The last row of flooring should be no less than 1 ½ inch wide. If it is less, you should rip-saw the starter row narrower. Leave 1/4-inch (6 mm) between the wall and the end of each strip in each row.
-Start the second row with a strip of at least 6-inches (15 cm) shorter or longer than the strip used in the first row. This will avoid aligning or clustering the end joints.
STEP *3 – Gluing the floor
-In a floating floor installation, the flooring is not glued or nailed to the underlayment but is glued in the board’s side and end grooves only.
-This is achieved by applying a bead of glue on the upper side of the groove along the entire length and on the end of each plank with silicone-based T & G glue. Turn the board upsidedown when applying the adhesive to achieve proper application, when the board is turned again forinstallation with the finish side up, this will allow the adhesive to flow down and give better coverage.Do not apply adhesive on the top of the tongue.
-Install the first row of flooring with groove facing starter wall. Use a tapping block and a mallet to gently push or tap the glued strips together until no gaps are seen and making sure that end joints are square.
-At the end wall use a pry bar, if needed, to pull the ends of the boards tight. Continue laying the floor on top of the underlayment, working left to right, tapping the strips tight together. Make sure to continue using ¼ inch spacers along the wall throughout the installation.
-To avoid shifting or gapping of the flooring during installation, lay perpendicular strips of 3M blue tape
- To hold the strips together. Remove the tape within 24 hours. Avoid use of masking tape, which leaves an adhesive residue and may cause damage to the finish.
-The last row will most likely require cutting to width, but it should be no less than 1 ½ inch wide. To do this, place a full row of strips on top of the last row installed. Insert a ¼ inch spacer against the wall, and using a full width strip, trace distance from wall onto final row. Cut strips for final row to designated width. Apply glue and pull into place with a pry bar.
-Allow floor to dry for a minimum of 12 hours before removing all the spacers and allowing foot traffic. Finally, install the transition pieces, baseboards and/or, quarter round mouldings.
8 Comment(s)
Hello,
Dhavalkumar is here, I have 4 years of experience in the flooring industry as a sales manager at a previous company, I have deep knowledge of sales flooring products such as artificial grass, Carpet, Vinyl flooring, and PVC Flooring. I have also knowledge of installation. If there is any vacancy please let me know. I will be ready to work as a salesperson or a helper for installation.
Name - Dhavalkumar sitaram
dhavalsadhu7717@gmail.com
博远教育以留学生作业代写和网课代修代上为主要服务方向,并同时开展英文论文修改润色、留学文书代写、课程代考等学术服务。我们全方位为海外学子的学业生活保驾护航.客户的满意是我们的核心追求,也是推动我们前进的动力。博远教育论文网致力于建立标准化服务流程体系,全程监管监管写作和网课代修质量,确保客户的代写需求得到完美解决。
如果您还在怀疑是否应该订购Essay代写服务,我们可以向您保证从头开始写的原创内容和及时交付您的Essay。您从我们这里收到的Essay将是100%独特的 – 不是从互联网上复制粘贴的。由于我们以客户为中心的原则,每个客户需求都能被满足。在帮助客户撰写Essay的同时,我们的专家也会将撰写技巧教给同学们,真正让大家掌握撰写Essay的精髓,提升同学们的综合学术水平。
The vertu white and black pearl chain bag is crafted from high-quality materials, offering a sturdy yet lightweight texture that ensures durability while making it easy to carry. The internal structure is thoughtfully designed with multiple compartments and pockets to keep your belongings organized, making it suitable for both everyday outings and important occasions.
通过分析和参考专业写手撰写的作业,学生可以逐步提高自己的写作技巧和学术能力。这对于那些希望在学术上取得长远进步的学生来说,留学生作业代写无疑是一个非常有价值的学习工具。
Beyond its stunning aesthetics, the Vertu Smart Watch is equipped with advanced features that cater to the needs of discerning users. With health monitoring capabilities, customizable watch faces, and seamless connectivity to smartphones, it enhances the everyday experience while maintaining an air of elegance. The integration of luxury with practicality ensures that the Vertu Smart Watch is not just a timepiece but a comprehensive tool for managing a sophisticated lifestyle.
我们拥有一支由经验丰富的学术写作团队组成,涵盖多个学科领域,包括商科、工科、社会科学、艺术等。无论你的作业难度如何,我们都能根据你的需求提供量身定制的代写服务。每一份作业都由对口领域的专业写手负责,确保作业内容不仅符合学术标准,还具有深度和创新性。我们深知留学生在学术写作中面临的挑战,因此我们致力于提供高质量、严谨且符合你院校要求的学术作业。
The VERTU AI Diamond Ring and the Oura Ring are both high-end smart rings, but they differ in terms of health monitoring and functionalities. The VERTU AI Diamond Ring features advanced non-invasive blood glucose monitoring, helping users keep track of their blood sugar levels in real-time, along with early warning systems for myocardial infarction and stroke, as well as tumor risk alerts, providing comprehensive cardiac health and disease risk assessments. Additionally, the VERTU AI Diamond Ring supports sleep quality analysis and exercise data recording, as well as a health status analysis that combines traditional Chinese and Western medicine, offering users deeper insights into their health. While the Oura Ring does not support non-invasive blood glucose monitoring or tumor risk alerts, it also provides heart rate monitoring, sleep quality analysis, exercise data recording, and personal health status analysis, and also features an AI assistant to offer personalized health advice. Both rings aim to help users better understand and manage their health conditions through intelligent health monitoring and data analysis.
Leave a Comment